A Shewhart control chart is out of control if any point exceeds the 3σ control limits—but that is only one of eight patterns that signal a process has changed. The Western Electric run rules (from the 1956 Statistical Quality Control Handbook) define seven additional patterns that are statistically unlikely if the process were stable. Each is compared against σ zones measured from the centerline.
Zone definitions
Divide each half of the control chart into three equal zones (each one standard deviation wide):
- Zone C: within ±1σ of the centerline
- Zone B: between 1σ and 2σ from the centerline
- Zone A: between 2σ and 3σ from the centerline (just inside the control limits)
The eight rules
| Rule | Pattern | Probability (if stable) |
|---|---|---|
| 1 | 1 point beyond 3σ (outside control limit) | 0.27 % |
| 2 | 2 of 3 consecutive points in Zone A or beyond (same side) | ≈ 0.39 % |
| 3 | 4 of 5 consecutive points in Zone B or beyond (same side) | ≈ 0.54 % |
| 4 | 8 consecutive points on the same side of the centerline (Zone C or beyond) | ≈ 0.39 % |
| 5 | 6 points in a row steadily increasing or decreasing (a trend) | ≈ 0.28 % |
| 6 | 15 consecutive points in Zone C (hugging the centerline) | Stratification signal |
| 7 | 14 points in a row alternating up and down | Systematic oscillation |
| 8 | 8 points in a row with none in Zone C (avoiding the center) | Mixture of two processes |
What each pattern means in practice
- Rules 1–4 indicate a shift in the mean. Look for operator changes, material lots, setups, or environmental changes.
- Rule 5 (trend) indicates drift: tool wear, machine warm-up, material creep, or a slow process change.
- Rule 6 (hugging) often means the chart was constructed from a mixture of subgroups from two different distributions. Each distribution individually is tight, making the combined chart “too stable.”
- Rule 7 (oscillation) suggests overadjustment: an operator is correcting a process that is actually in control, creating a pendulum effect.
- Rule 8 (bimodal) is characteristic of two streams mixed into one chart: two machines, two materials, or two shifts whose data are combined.
Common exam traps
- More rules = more false alarms. Each additional sensitizing rule increases the false-alarm rate. Many companies apply only rules 1–4 in production to keep false alarms manageable.
- The rules apply independently. Any single rule firing is sufficient to call the process out of control. You do not need all eight to trigger simultaneously.
- Rules apply to the same side of the centerline for runs rules 2–4. “2 of 3 in Zone A” means 2 of 3 on the same side. Points alternating above and below do not satisfy a run rule.
Try 5 free CQE practice questions on this exact topic. Every wrong answer comes with an explanation. No account needed.
Take the free CQE quizMore: 5 Whys · 8D problem solving · AOQ & AOQL · APQP & PPAP · AQL sampling plans · Attribute agreement & kappa · Attribute control charts · Availability & maintainability · Benchmarking types · Binomial vs Poisson · Blocking & randomization · Calibration & traceability · Capability: non-normal · Chi-square test · Confidence intervals · Control chart selection · Control plan · CA effectiveness · Cost of quality · Cp vs Cpk vs Cpm · Cpk vs Ppk · CQE exam day tips · CQE study plan · CQE vs CQA vs CSSBB · Is the CQE worth it? · CUSUM & EWMA · Design reviews · Design V&V · Destructive testing · DFMEA vs PFMEA · Document control · Fault tree analysis · First article inspection · Fishbone diagram · FMEA: RPN vs AP · Full vs fractional factorial · Gage R&R · GD&T basics · Hazard vs risk vs harm · Hypothesis test selection · I-MR chart · Interaction plots · ISO 14971 · ISO 9001 clauses · Kaizen event planning · Kano model · Lean wastes (TIMWOODS) · Linear regression · Management review · MRB dispositions · MSA: bias, linearity & stability · NCR, CAPA & PA · Nonparametric tests · Normal distribution & z-table · One-way ANOVA · p-value explained · Pareto chart · PDCA vs DMAIC · Poka-yoke · QFD / House of Quality · Quality audits · Quality mgmt principles · Quality manual vs procedures · Quality plan vs control plan · Redundancy: parallel & standby · Reliability allocation · Bathtub curve & MTBF · Response surface methods · Risk-based thinking · Risk matrix vs FMEA · 7 mgmt & planning tools · Short-run SPC · Six Sigma certifications · Sigma level & DPMO · Six Sigma DMAIC · Supplier quality scorecards · Switching rules (sampling) · Taguchi loss function · Theory of constraints · Tolerance stackup · Traceability & lot control · Type I vs II error · Value stream mapping · Variables vs attributes · Weibull analysis · Western Electric rules · X-bar R vs X-bar S · CQE calculators · Study planner · Section quiz
CQE Quest by Bizarre Act. Original study material; not affiliated with ASQ. CQE is a certification of ASQ. Terms · Privacy