When a product is found nonconforming, a Material Review Board (MRB) evaluates it and assigns a disposition — a decision about what to do with the material.
| Disposition | Meaning | When used |
|---|---|---|
| Use-as-is (UAI) | Accept without change | Nonconformance does not affect form, fit, or function |
| Rework | Bring into conformance by a defined operation | Defect is correctable and the result will be fully conforming |
| Repair | Restore functionality but result may still deviate from drawing | Full conformance is not achievable — requires engineering approval |
| Scrap | Destroy or render unusable | No path to conformance; cost of rework exceeds value |
| Return to vendor (RTV) | Send back to supplier | Nonconformance originated at supplier; costs charged back |
UAI and Repair dispositions for safety-critical parts typically require engineering and customer approval. All MRB decisions must be documented with the nonconformance description, root cause (if known), disposition rationale, and authorized signatures.
More: 5 Whys · 8D problem solving · AOQ & AOQL · APQP & PPAP · AQL sampling plans · Attribute agreement & kappa · Attribute control charts · Availability & maintainability · Benchmarking types · Binomial vs Poisson · Blocking & randomization · Calibration & traceability · Capability: non-normal · Chi-square test · Confidence intervals · Control chart selection · Control plan · CA effectiveness · Cost of quality · Cp vs Cpk vs Cpm · Cpk vs Ppk · CQE exam day tips · CQE study plan · CQE vs CQA vs CSSBB · Is the CQE worth it? · CUSUM & EWMA · Design reviews · Design V&V · Destructive testing · DFMEA vs PFMEA · Document control · Fault tree analysis · First article inspection · Fishbone diagram · FMEA: RPN vs AP · Full vs fractional factorial · Gage R&R · GD&T basics · Hazard vs risk vs harm · Hypothesis test selection · I-MR chart · Interaction plots · ISO 14971 · ISO 9001 clauses · Kaizen event planning · Kano model · Lean wastes (TIMWOODS) · Linear regression · Management review · MRB dispositions · MSA: bias, linearity & stability · NCR, CAPA & PA · Nonparametric tests · Normal distribution & z-table · One-way ANOVA · p-value explained · Pareto chart · PDCA vs DMAIC · Poka-yoke · QFD / House of Quality · Quality audits · Quality mgmt principles · Quality manual vs procedures · Quality plan vs control plan · Redundancy: parallel & standby · Reliability allocation · Bathtub curve & MTBF · Response surface methods · Risk-based thinking · Risk matrix vs FMEA · 7 mgmt & planning tools · Short-run SPC · Six Sigma certifications · Sigma level & DPMO · Six Sigma DMAIC · Supplier quality scorecards · Switching rules (sampling) · Taguchi loss function · Theory of constraints · Tolerance stackup · Traceability & lot control · Type I vs II error · Value stream mapping · Variables vs attributes · Weibull analysis · Western Electric rules · X-bar R vs X-bar S · CQE calculators · Study planner · Section quiz
Not affiliated with ASQ. © 2025 bizarreact.com