๐Ÿ“ CQE Quest โ€บ Learn

Full vs fractional factorial designs (DOE)

Short answer: a full factorial tests every combination of factor levels. With k factors at 2 levels, that's 2k runs, and you can estimate every main effect and interaction. A fractional factorial (2kโˆ’p) runs only a planned fraction of those combinations. That saves runs, but some effects become aliased (confounded): the data can't tell them apart.

Run counts

FactorsFull 2kHalf fractionTypical screening
4168 (res IV)โ€”
53216 (res V)8 (res III)
712864 (res VII)8 (res III)

Resolution in one line each

Worked example: estimating effects in a 2ยฒ design

The factors are temperature (A) and pressure (B), each at a low (โˆ’) and high (+) level, and the response is yield. The results: (โˆ’,โˆ’) = 20, (+,โˆ’) = 30, (โˆ’,+) = 24, (+,+) = 40.

Effect A = avg(A high) โˆ’ avg(A low) = (30+40)/2 โˆ’ (20+24)/2 = 13.0 Effect B = (24+40)/2 โˆ’ (20+30)/2 = 7.0 Effect AB = (20+40)/2 โˆ’ (30+24)/2 = 3.0

What it means: temperature has the biggest effect, pressure has a smaller one, and the interaction is small. In a fractional design, each estimate like these is really the sum of the effect and all of its aliases. That's why you choose the resolution based on which interactions you can assume are negligible.

Common exam traps

Test yourself in 2 minutes

Try 5 free CQE practice questions, including a calculation problem with fresh numbers. Every wrong answer comes with an explanation. No account needed.

Take the free CQE quiz

More: 5 Whys · 8D problem solving · AOQ & AOQL · APQP & PPAP · AQL sampling plans · Attribute agreement & kappa · Attribute control charts · Availability & maintainability · Benchmarking types · Binomial vs Poisson · Blocking & randomization · Calibration & traceability · Capability: non-normal · Chi-square test · Confidence intervals · Control chart selection · Control plan · CA effectiveness · Cost of quality · Cp vs Cpk vs Cpm · Cpk vs Ppk · CQE exam day tips · CQE study plan · CQE vs CQA vs CSSBB · Is the CQE worth it? · CUSUM & EWMA · Design reviews · Design V&V · Destructive testing · DFMEA vs PFMEA · Document control · Fault tree analysis · First article inspection · Fishbone diagram · FMEA: RPN vs AP · Full vs fractional factorial · Gage R&R · GD&T basics · Hazard vs risk vs harm · Hypothesis test selection · I-MR chart · Interaction plots · ISO 14971 · ISO 9001 clauses · Kaizen event planning · Kano model · Lean wastes (TIMWOODS) · Linear regression · Management review · MRB dispositions · MSA: bias, linearity & stability · NCR, CAPA & PA · Nonparametric tests · Normal distribution & z-table · One-way ANOVA · p-value explained · Pareto chart · PDCA vs DMAIC · Poka-yoke · QFD / House of Quality · Quality audits · Quality mgmt principles · Quality manual vs procedures · Quality plan vs control plan · Redundancy: parallel & standby · Reliability allocation · Bathtub curve & MTBF · Response surface methods · Risk-based thinking · Risk matrix vs FMEA · 7 mgmt & planning tools · Short-run SPC · Six Sigma certifications · Sigma level & DPMO · Six Sigma DMAIC · Supplier quality scorecards · Switching rules (sampling) · Taguchi loss function · Theory of constraints · Tolerance stackup · Traceability & lot control · Type I vs II error · Value stream mapping · Variables vs attributes · Weibull analysis · Western Electric rules · X-bar R vs X-bar S · CQE calculators · Study planner · Section quiz

CQE Quest by Bizarre Act. Original study material; not affiliated with ASQ. CQE is a certification of ASQ. Terms ยท Privacy