📐 CQE Quest › Learn

The bathtub curve and MTBF, explained

Short answer: the bathtub curve plots failure rate over a product's life, and it has three phases:

MTBF and the exponential model

In the useful-life phase, failure rate λ = failures / total operating time, MTBF = 1/λ, and the chance of surviving to time t is R(t) = e−λt.

Worked example

20 units run for 500 hours each, and 4 fail. Failed units are replaced right away, so total operating time is 20 × 500 hours.

Total time = 20 × 500 = 10000 h MTBF = 10000 / 4 = 2500 h λ = 1 / 2500 = 0.0004 per hour R(100 h) = e^(−0.0004 × 100) = 0.961 R(2500 h) = e^(−1) = 0.368

What it means: a single unit has about a 96% chance of running 100 hours without failing. Only about 37% of units survive to the MTBF. MTBF is not "how long a typical unit lasts."

Common exam traps

MTBF & exponential reliability calculator

Enter failures and total operating time to get λ and MTBF, then compute R(t) for any mission time.


More reliability tools: CQE calculators →

Test yourself in 2 minutes

Try 5 free CQE practice questions, including a calculation problem with fresh numbers. Every wrong answer comes with an explanation. No account needed.

Take the free CQE quiz

More: 5 Whys · 8D problem solving · AOQ & AOQL · APQP & PPAP · AQL sampling plans · Attribute agreement & kappa · Attribute control charts · Availability & maintainability · Benchmarking types · Binomial vs Poisson · Blocking & randomization · Calibration & traceability · Capability: non-normal · Chi-square test · Confidence intervals · Control chart selection · Control plan · CA effectiveness · Cost of quality · Cp vs Cpk vs Cpm · Cpk vs Ppk · CQE exam day tips · CQE study plan · CQE vs CQA vs CSSBB · Is the CQE worth it? · CUSUM & EWMA · Design reviews · Design V&V · Destructive testing · DFMEA vs PFMEA · Document control · Fault tree analysis · First article inspection · Fishbone diagram · FMEA: RPN vs AP · Full vs fractional factorial · Gage R&R · GD&T basics · Hazard vs risk vs harm · Hypothesis test selection · I-MR chart · Interaction plots · ISO 14971 · ISO 9001 clauses · Kaizen event planning · Kano model · Lean wastes (TIMWOODS) · Linear regression · Management review · MRB dispositions · MSA: bias, linearity & stability · NCR, CAPA & PA · Nonparametric tests · Normal distribution & z-table · One-way ANOVA · p-value explained · Pareto chart · PDCA vs DMAIC · Poka-yoke · QFD / House of Quality · Quality audits · Quality mgmt principles · Quality manual vs procedures · Quality plan vs control plan · Redundancy: parallel & standby · Reliability allocation · Bathtub curve & MTBF · Response surface methods · Risk-based thinking · Risk matrix vs FMEA · 7 mgmt & planning tools · Short-run SPC · Six Sigma certifications · Sigma level & DPMO · Six Sigma DMAIC · Supplier quality scorecards · Switching rules (sampling) · Taguchi loss function · Theory of constraints · Tolerance stackup · Traceability & lot control · Type I vs II error · Value stream mapping · Variables vs attributes · Weibull analysis · Western Electric rules · X-bar R vs X-bar S · CQE calculators · Study planner · Section quiz

CQE Quest by Bizarre Act. Original study material; not affiliated with ASQ. CQE is a certification of ASQ. Terms · Privacy