🎓 CSSBB Quest › Section VII

Section VII — Improve Phase ~14%

Improve carries 21 of the 150 scored questions. The 2022 BoK groups it into design of experiments, lean methods, and implementation. Questions test the BB’s ability to find the settings that improve the process, remove waste, and select, pilot and implement solutions. The Improve tollgate is where the Champion decides whether to scale.

Improve subtopics

SubtopicKey exam content
A. Design of experiments (DOE)Terminology (factors, levels, response, treatment, replication, randomization, blocking); planning; one-factor experiments; two-level full and fractional factorial designs; main effects, interactions; resolution (III, IV, V)
Solution selectionSolution selection matrix (weighted criteria), Pugh matrix, PICK chart (payoff vs. difficulty), piloting logic
B. Lean methodsWaste elimination (pull, kanban, 5S, standard work, mistake-proofing); cycle-time reduction (continuous flow, single-piece flow, setup reduction/SMED); kaizen and kaizen blitz; future-state value stream maps
Waste analysisEight wastes (DOWNTIME: Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra-processing)
Mistake-proofing (poka-yoke)Prevention vs. detection poka-yoke; levels (shutdown, control, warning); examples by mistake type
C. Implementation: piloting and scalingPilot plan, success criteria, risk assessment (FMEA revisited), stakeholder communication, change management
C. Implementation: planning and evaluationPilot tests and simulations, implementation plan, communication and training plan, evaluating results against the goal

DOE resolution guide

ResolutionWhat’s confoundedWhen to use
IIIMain effects with 2-factor interactionsScreening (many factors, few runs) — not for optimization
IV2-factor interactions with each other (main effects only with 3-factor interactions)Characterization; main effects are clear
V2-factor interactions with 3-factor interactionsReliable estimates of main effects and 2-factor interactions
Full factorialNothing confoundedWhen all interactions must be estimated

A 2k full factorial needs 2k runs per replicate (e.g., 4 factors = 16 runs); a half fraction 2k−1 needs half as many (8 runs).

Eight lean wastes (DOWNTIME)

Exam trap: In the Toyota Production System view, overproduction is the worst waste because it creates or hides the others (inventory, waiting, transport, defects).

Takt time

Takt time sets the pace of production to match customer demand:

Takt time = Available production time ÷ Customer demand rate

Example: 480 min/day available ÷ 120 units/day demand = 4 min/unit takt time

If cycle time > takt time → process can’t meet demand → bottleneck
If cycle time < takt time → step has spare capacity; running it flat out without pull risks overproduction

Mistake-proofing hierarchy

LevelTypeExample
BestElimination — redesign so error is impossibleAsymmetric connector that can only go in one way
Prevention — physical/process feature stops the errorJig that won’t close unless part is correctly oriented
Detection — alerts when error occurs or is about toVision system that rejects a misassembled unit
WeakestWarning — notifies operator; relies on human actionLight or alarm that operator must respond to

PICK chart (solution prioritization)

The PICK chart plots candidate solutions on a 2×2 grid of Payoff (benefit, y-axis) vs. Difficulty (effort/cost, x-axis):

Learn pages for Section VII

Design of experiments
Full & fractional factorial
Solution selection
Weighted matrix, PICK chart
Mistake-proofing
Poka-yoke, prevention levels
Piloting & scaling
Pilot plan, success criteria
Improve tollgate
Deliverables, Champion sign-off
Test yourself

Try the free 25-question CSSBB diagnostic: questions across all 9 BoK sections, with an explanation for every answer and a score by section.

Take the free CSSBB diagnostic

All CSSBB sections

CSSBB Quest by Bizarre Act. Original study material; not affiliated with ASQ. CSSBB is a certification of ASQ. Terms · Privacy