Section VIII — Control Phase ~11%
Control carries about 17 of the 150 scored questions, and it matters more than its weight suggests: a project with a weak Control phase reverts. The 2022 BoK covers statistical process control (SPC), other controls (total productive maintenance and the visual factory), maintaining controls (measurement system re-analysis and the control plan), and sustaining improvements (lessons learned, documentation, training, ongoing evaluation). Questions focus on which control chart to use, how to interpret its signals, what a control plan contains, and how to hand off to the process owner.
Control phase deliverables
| Deliverable | What it contains | Who owns it after the BB closes the project? |
|---|---|---|
| Control plan | For each key process input variable (KPIV) and key output variable (KPOV): what to measure, how, frequency, sample size, control method, and reaction plan | Process owner |
| Updated process documentation | Revised SOPs, work instructions, training materials reflecting the improved process | Quality/documentation system |
| Statistical process control (SPC) charts | Ongoing monitoring of in-control limits established from the improved process | Process operator/process owner |
| Other controls | Total productive maintenance (TPM) to keep equipment capable; visual controls (visual factory) so abnormal conditions are obvious at a glance | Process owner |
| Measurement system re-analysis | Periodic MSA so the gauges used for control stay adequate as the process improves | Quality / metrology |
| Lessons learned | What worked, what to do differently, tools and insights for future BBs | MBB / program manager |
| Project closure report | Final capability results vs. baseline, validated savings, benefits realization timeline | Champion and Finance |
Selecting the right control chart
| Data type | Subgroup size | Chart |
|---|---|---|
| Continuous (variables) | Individual measurements (n = 1) | I-MR (individuals & moving range) |
| Small subgroups (about 2–9) | X̄-R (X-bar and range) | |
| Larger subgroups (about 10 or more) | X̄-s (X-bar and standard deviation) | |
| Attribute (discrete) | Defective units, constant subgroup size | np-chart (count defective) or p-chart (proportion defective) |
| Defective units, varying subgroup size | p-chart (control limits vary with n) | |
| Tracking count of defects (not defectives) per unit | c-chart (constant sample) or u-chart (variable sample) |
Exam trap: defective vs. defect — a defective unit is a unit that fails (pass/fail); a defect is a single nonconformance on a unit. A unit can have multiple defects. p- and np-charts track defective units; c- and u-charts track defects.
Common out-of-control tests
The classic Western Electric rules (zones measured from the center line):
- Rule 1: One point beyond the 3σ control limits
- Rule 2: Two of three consecutive points beyond 2σ on the same side
- Rule 3: Four of five consecutive points beyond 1σ on the same side
- Rule 4: Eight consecutive points on the same side of the center line
Software often uses the related Nelson tests instead, such as nine points in a row on one side (a shift), six points in a row steadily increasing or decreasing (a trend), and fifteen points in a row within 1σ of the center line (stratification).
Exam trap: fifteen points hugging the center line looks like “great stability” but usually means the control limits are too wide — for example, subgroups mix several streams or the limits were calculated from the wrong data.
Reaction plan — what must it contain?
The reaction plan in the control plan answers three questions for every out-of-control signal: (1) Who is responsible for the response? (2) What immediate action stops the process or prevents product release? (3) What investigation or escalation path follows?
A reaction plan that says “notify supervisor” is insufficient if it doesn’t also say what the supervisor does and how the root cause is investigated before restarting.
Handing off to the process owner
The BB’s job ends when the process owner can maintain the gains independently. The handoff package includes the control plan, the SPC charts with established limits, training records for operators, and updated documentation. The BB should plan a follow-up review after handoff (the length is set by the organization and the process) to verify gains are sustained before formally closing the project.
Learn pages for Section VIII
Try the free 25-question CSSBB diagnostic: questions across all 9 BoK sections, with an explanation for every answer and a score by section.
Take the free CSSBB diagnosticAll CSSBB sections
CSSBB Quest by Bizarre Act. Original study material; not affiliated with ASQ. CSSBB is a certification of ASQ. Terms · Privacy