How it is calculated

Run time = planned − downtime = 450 − 54 = 396 min Availability = run time / planned time = 396 / 450 = 88.0% Performance = (ideal cycle × total) / run time = (30 s × 700 = 350 min) / 396 = 88.4% Quality = good / total = 672 / 700 = 96.0% OEE = A × P × Q = 74.7% Check: good × ideal cycle = 672 × 30 s = 336 min of fully productive time; 336 / 450 = 74.7%

Where the time goes: the six big losses

OEE factorLossExamples
AvailabilityEquipment failure; setup and adjustmentBreakdowns, changeovers, waiting for material or an operator
PerformanceIdling and minor stops; reduced speedJams and short stops nobody logs, running below the ideal rate
QualityProcess defects; startup rejectsScrap, rework, parts made while the process warms up

Attack the biggest loss first. The calculator turns each factor into minutes so the losses can be compared on one scale.

Mistakes to avoid

Read more: Takt time · The 8 lean wastes · Theory of constraints · Availability and maintainability

FAQ

What is a good OEE score?

85% is the figure most often quoted as world class, from the early TPM literature. Many plants that measure honestly for the first time land well below that. The number matters less than the trend and which of the three losses is biggest.

What should count as planned production time?

Shift time minus planned stops such as breaks, meetings and planned maintenance. Everything else that stops the line (breakdowns, changeovers, waiting for material) is downtime and counts against availability.

What ideal cycle time should I use?

The fastest rate the equipment can sustain for this product, from the nameplate or the best demonstrated rate. If you use the average rate, performance looks close to 100% and the slow-cycle loss disappears from view.

How is OEE different from availability or utilization?

Availability only sees stops. OEE also sees slow running (performance) and scrap or rework (quality). A line can be available 95% of the time and still have an OEE of 60%.

Can I average OEE across machines?

Not as a simple average. Add up the fully productive time and the planned time across machines (or weight by planned time). A simple average gives a small machine the same weight as a large one.

Lean metrics are on the Six Sigma exams

This shows up on the exams as a calculation question. Practice it with new numbers every time, and every wrong answer explained.

Free Green Belt diagnostic (20 questions)
Free Black Belt diagnostic (25 questions)

Related free tools

DPMO and sigma level calculator · Control limits calculator · Reliability calculator · Sample size calculator · All tools

Link to this calculator

Using it in a training deck, an SOP or a forum answer? Copy this link. It stays free.

Studying for the CQE?

Try 5 free practice questions with an explanation for every wrong answer.

Take the free CQE quiz