Free tools › Control limits calculator

Control limits calculator

Paste your data and get the center line, upper and lower control limits, a plotted chart and the points outside the limits. Not sure which chart? Use the control chart picker.

Formulas

ChartCenter lineControl limits
I (individuals)X̄X̄ ± 2.66 × MR̄
MR (moving range)MR̄UCL = 3.267 × MR̄, LCL = 0
X̄X̿X̿ ± A₂ × R̄
RR̄UCL = D₄ × R̄, LCL = D₃ × R̄
pp̄ = total defective / total inspectedp̄ ± 3√(p̄(1 − p̄)/n)
npnp̄np̄ ± 3√(np̄(1 − p̄))
cc̄c̄ ± 3√c̄
uū = total defects / total unitsū ± 3√(ū/n)

2.66 = 3/d₂ and 3.267 = D₄ for a moving range of 2. A₂, D₃ and D₄ for every subgroup size are in the control chart constants table. A negative LCL is set to none.

Reading the chart

This calculator flags points beyond the 3σ limits (rule 1). Runs, trends and points hugging one side can also signal a special cause; see the Western Electric run rules. Limits computed from your own data are trial (Phase I) limits: find and fix the causes of any signals, then freeze the limits and use them for new data.

Read more: Choosing a control chart · I-MR chart · X̄-R vs X̄-S · Attribute control charts

FAQ

What is the difference between control limits and specification limits?

Control limits come from the process data and show what the process does when only common-cause variation is present. Specification limits come from the customer or the design and show what is acceptable. A process can be in control and still make parts out of spec; that is a capability problem.

How many data points do I need?

20 to 25 subgroups (or 20 to 25 individual values for an I-MR chart) is the usual minimum for trial limits. Fewer points give limits that move a lot when new data arrive.

Why is the lower control limit missing?

For counts and for ranges, a negative limit is impossible, so it is set to zero (no LCL). For p and u charts this happens when the average rate or the sample size is small.

Why are my p chart limits different for each point?

The limits depend on the sample size. When n changes from sample to sample, each point gets its own limits, which is why they look like steps.

Should I remove out-of-control points and recalculate?

Only after you find and remove the assignable cause. Then recalculate the limits without those points. If you cannot find a cause, keep the points in; dropping them makes the limits look tighter than the process really is.

Control charts are on every quality exam

This shows up on the exams as a calculation question. Practice it with new numbers every time, and every wrong answer explained.

Free CQE quiz (5 questions)
Free Green Belt diagnostic (20 questions)
Free Black Belt diagnostic (25 questions)

Related free tools

Control chart picker · Control chart constants · Cpk and Ppk from raw data · DPMO and sigma level calculator · All tools

Link to this calculator

Using it in a training deck, an SOP or a forum answer? Copy this link. It stays free.

Studying for the CQE?

Try 5 free practice questions with an explanation for every wrong answer.

Take the free CQE quiz