🏭 CSSGB Quest › Learn
8 wastes (DOWNTIME)
Lean thinking defines waste (muda) as any activity that consumes resources without adding value for the customer. The Toyota Production System originally identified 7 wastes; later lean writers added an 8th, non-utilized talent. The acronym DOWNTIME covers all eight.
The 8 wastes: DOWNTIME
| Letter | Waste | Description | Pharma example |
|---|---|---|---|
| D | Defects | Products or services that don’t meet requirements; rework and scrap | Tablets rejected at in-process inspection; batch rework due to fill weight OOS |
| O | Overproduction | Making more than needed, sooner than needed | Printing more labels than the batch requires; compressing extra tablets "just in case" |
| W | Waiting | Idle time when people, equipment, or materials are not moving | Operators waiting for QC release; equipment idle waiting for materials |
| N | Non-utilized talent | Not using employees’ full skills, knowledge, and creativity | Line operators with improvement ideas that are never surfaced; SMEs doing data entry |
| T | Transportation | Unnecessary movement of materials or products | Moving bulk tablets from compression to a staging area then back to packaging |
| I | Inventory | Excess raw materials, WIP, or finished goods beyond immediate need | Large API safety stock tying up cold storage; WIP queue between compression and packaging |
| M | Motion | Unnecessary movement of people | Operators walking long distances to retrieve batch records; tools not at point of use |
| E | Extra processing | More work than the customer requires; over-engineering | Three-level approval chain for a minor batch record correction; duplicate data entry |
Value vs. non-value-added activities
| Category | Definition | Example |
|---|---|---|
| Value-added (VA) | Transforms the product; customer would pay for it | Compressing API into tablets; coating tablets |
| Non-value-added but necessary (NVBN) | Does not transform the product but is required by regulation, safety, or current process constraints | QC release testing; regulatory documentation; equipment calibration |
| Pure waste (NVA) | No transformation; not required; eliminate first | Re-entering batch data from paper to spreadsheet; searching for misplaced documents |
Waste identification on the gemba walk
A gemba walk ("go to where the work happens") is how you identify waste in practice. During a gemba walk:
- Observe the process as it actually runs — don’t rely on the SOP or what people say they do.
- Note each step: is it value-added, necessary, or pure waste?
- Map waiting times, distances traveled, and queue depths.
- Ask workers about obstacles and workarounds — they often know the waste better than anyone.
The waste hierarchy: eliminate → reduce → accept
- Eliminate: Remove the activity entirely. Best outcome.
- Reduce: Decrease the time, frequency, or volume of the waste.
- Accept (necessary waste): Some non-value-added activity is required by regulation or safety. Minimize but do not remove.
Common exam traps
- DOWNTIME includes unused talent as the 8th waste. Some older texts list only 7 wastes (TIMWOOD). Know both acronyms; the 8-waste version is the one most study materials now use.
- Overproduction is considered the worst waste in traditional lean thinking because it causes or amplifies most of the others (excess inventory, transportation, motion).
- Transportation ≠ motion. Transportation = moving materials or products. Motion = moving people.
- Not all waiting is waste. Required inspection hold times (e.g., stability testing) are necessary non-value-added. Pure waiting (idle queue between steps when resources are available) is waste.
Test yourself
The free 20-question CSSGB diagnostic covers all six Body of Knowledge sections, with an explanation for every answer.
Take the free CSSGB diagnosticMore: Value stream mapping · 5S workplace · Takt time · Mistake-proofing · SIPOC & process maps
CSSGB Quest by Bizarre Act. Original study material; not affiliated with ASQ. CSSGB is a certification of ASQ. Terms · Privacy