Green Belt project charter

The project charter is the Define phase’s core deliverable. It is a written contract between the GB and the sponsoring organization that answers six questions: why this project, what is wrong, how bad is it, how much better will it get, who is involved, and by when. A poorly written charter is a frequent cause of scope creep and stalled projects.

Six charter elements

ElementWhat it must containCommon mistake
Business caseWhy this project matters: financial impact, customer risk, or strategic alignmentToo vague (“quality is important”); no dollar estimate
Problem statementWhat is wrong, where, how often, and since when — no causes, no solutionsEmbedding a cause (“because operators skip the step”) or solution (“we will buy new equipment”)
Goal statementSMART target: Specific, Measurable, Achievable, Relevant, Time-bound“Improve quality” with no number or deadline
ScopeClear in-scope and out-of-scope boundaries; process start and stop pointsScope so wide the GB cannot finish in a few months
TeamGB, Champion, process owner, subject-matter expertsNo process owner named; no Champion identified
TimelineTollgate dates for each DMAIC phase, final closure dateNo dates; or entire project compressed into 3 weeks

Worked example: ZZMedical tablet yield project

Project: Reduce Examplorphine 10 mg tablet yield loss at ZZMedical Packaging Line 2

Business case: Yield losses on Line 2 cost approximately $180,000 per year in scrapped product and rework labor. Line 2 produces 35% of total Examplorphine output. Repeated yield excursions have triggered two customer delivery delays in the past year.

Problem statement: The first-pass yield on ZZMedical Packaging Line 2 averaged 91.4% over the 12 months January–December 2025, measured at final in-process inspection. The internal target is ≥97.0%.

Goal statement: Increase Line 2 first-pass yield from 91.4% to ≥96.0% by April 30, 2026. If yield-loss cost scales with the loss rate, cutting loss from 8.6% to 4.0% saves about $180,000 × (8.6 − 4.0) / 8.6 ≈ $96,000 per year.

Scope: In scope: Tablet filling through final sealing on Line 2. Out of scope: Tablet compression, Lines 1 and 3, and label printing.

Team: GB: R. Exampl · Champion: QA Director · Process owner: Line 2 supervisor · SME: Packaging engineer

Timeline: Define – Oct 31 · Measure – Dec 15 · Analyze – Jan 31 · Improve – Mar 15 · Control – Apr 30

Writing a valid problem statement

Test your problem statement against these five rules:

SMART goals for Green Belt projects

LetterMeaningTest
SSpecificNames the metric and process, not just “quality”
MMeasurableHas a number: from X% to Y%
AAchievableRealistic for a GB-level project in the time allowed
RRelevantLinked to the business case (cost, customer, strategy)
TTime-boundHas a deadline: “by April 30, 2026”

Common exam traps

Test yourself

The free 20-question CSSGB diagnostic covers all six Body of Knowledge sections, with an explanation for every answer.

Take the free CSSGB diagnostic

More: DMAIC overview · VOC & CTQ · SIPOC · Fishbone & 5 Whys · Solution selection · Control plan