Process capability: Cp, Cpk, DPMO

Process capability measures how well a process fits within its specification limits. A capable process consistently produces output within spec without requiring sorting or rework. Cp and Cpk are the standard indices; DPMO and sigma level translate capability into defect rates.

Key definitions

TermSymbolMeaning
Upper spec limitUSLMaximum acceptable value
Lower spec limitLSLMinimum acceptable value
Process meanμ or x̅Average of measured values
Process std devσ or sSpread of the process output
Spec widthUSL − LSLTotal tolerance allowed

Cp: potential capability

Cp compares the width of the specification to the width of the process. It assumes the process is centered on the target.

Cp = (USL - LSL) / (6σ)

Cp ignores centering. A process can have a high Cp but still produce many defects if it is off-center.

Cpk: actual capability

Cpk accounts for both spread and centering. It is always ≤ Cp.

Cpk = min[ (USL - x̄) / (3σ), (x̄ - LSL) / (3σ) ]

Worked example: Examplorphine fill weight

Spec: 245–255 mg (LSL = 245, USL = 255)
Process data: x̅ = 251.5 mg, s = 1.2 mg

Cp = (255 - 245) / (6 × 1.2) = 10 / 7.2 = 1.39 Cpk = min[ (255 - 251.5) / (3 × 1.2) → 3.5 / 3.6 = 0.97, (251.5 - 245) / (3 × 1.2) → 6.5 / 3.6 = 1.81 ] Cpk = 0.97 ← limited by the upper tail

Interpretation: The process has sufficient spread (Cp = 1.39) but is shifted high. The upper tail will produce defects above 255 mg. Action: re-center the process to the target (250 mg).

Sigma level and DPMO

DPMO (Defects Per Million Opportunities) and sigma level provide a universal quality language across industries.

Sigma levelDPMOYield
2σ308,53769.15%
3σ66,80793.32%
4σ6,21099.38%
5σ23399.977%
6σ3.499.9997%

The 6σ DPMO of 3.4 assumes a 1.5σ long-term shift of the process mean from target — the "Six Sigma shift." A truly centered process at 6σ would produce ~0.002 DPMO.

DPMO = (Defects / (Units × Opportunities per unit)) × 1,000,000

Pp and Ppk (performance indices)

Pp and Ppk use the overall standard deviation (all data combined) rather than the within-subgroup estimate. They answer "how has this process performed historically?" Cp/Cpk use the within-subgroup estimate and answer "what is this process capable of when in control?"

Index pairUsesAnswers
Cp / CpkWithin-subgroup σ̂Potential capability (when stable)
Pp / PpkOverall sample std dev sActual performance (historical)

Common exam traps

Test yourself

The free 20-question CSSGB diagnostic covers all six Body of Knowledge sections, with an explanation for every answer.

Take the free CSSGB diagnostic

More: Basic statistics · MSA · Control charts · Data types · Run charts

CSSGB Quest by Bizarre Act. Original study material; not affiliated with ASQ. CSSGB is a certification of ASQ. Terms · Privacy