1. DMAIC phases — Green Belt scope
| Phase | Green Belt focus |
| Define | Project charter, SIPOC, VOC/CTQ, stakeholder analysis, problem/goal statement |
| Measure | Data collection plan, MSA/Gage R&R, baseline capability (Cp, Cpk), process mapping |
| Analyze | Root cause tools (fishbone, 5-Why, Pareto), graphical analysis, basic hypothesis tests |
| Improve | Solution selection, mistake-proofing (poka-yoke), kaizen events, piloting |
| Control | Control plan, SPC charts, response plan, sustaining gains |
A GB project is typically 3–6 months, one process owner, one team. BB projects are broader and go deeper into statistics (multiple regression, advanced DOE, multivariate tools).
2. Lean fundamentals
| Takt time | Takt = Available production time / Customer demand rate |
| OEE (Overall Equipment Effectiveness) | OEE = Availability × Performance × Quality |
| Cycle time | CT = Net production time / Units produced |
| Little's Law | L = λ × W (inventory = throughput rate × lead time) |
| Flow efficiency | Value-added time / Total lead time × 100% |
| Process lead time | Sum of all cycle times + wait times in the value stream |
| First-pass yield | FPY = units passing first time / total units started |
| Rolled throughput yield | RTY = FPY₁ × FPY₂ × … × FPYₙ |
3. Process capability
| Cp | (USL − LSL) / 6σ_within (uses σ estimated from R̄/d₂) |
| Cpk | min[ (USL − x̄)/3σ, (x̄ − LSL)/3σ ] |
| Pp | (USL − LSL) / 6σ_overall (uses sample s) |
| Ppk | min[ (USL − x̄)/3σ_overall, (x̄ − LSL)/3σ_overall ] |
| Sigma level → DPMO | With the conventional 1.5σ shift: 3σ ≈ 66,807 DPMO; 4σ ≈ 6,210; 5σ ≈ 233; 6σ ≈ 3.4 |
| DPMO | Defects × 1,000,000 / (Units × Opportunities per unit) |
| Rule | Cp/Cpk require a stable, in-control process. Run a control chart first. |
4. Control charts
I-MR chart (individuals, moving range) — most common at GB level
| I chart center line | x̄ |
| I chart control limits | x̄ ± 2.66 MR̄ (where MR̄ = average of |xᵢ − xᵢ₋₁|) |
| MR chart UCL | 3.267 × MR̄ |
| σ estimate | σ̂ = MR̄ / 1.128 |
X̄-R chart (subgroups, n = 2..10)
| X̄ chart limits | x̿ ± A₂ × R̄ |
| R chart limits | D₃R̄ (LCL) to D₄R̄ (UCL) |
| σ estimate | σ̂ = R̄ / d₂ |
p chart (proportion defective)
| Center line | p̄ = total defectives / total inspected |
| Control limits | p̄ ± 3√[ p̄(1−p̄) / n ] |
| Note | Negative LCL set to 0. Use u chart for defects per unit. |
Control chart constants (n = 2–7)
| n | A₂ | d₂ | D₃ | D₄ |
| 2 | 1.880 | 1.128 | 0.000 | 3.267 |
| 3 | 1.023 | 1.693 | 0.000 | 2.574 |
| 4 | 0.729 | 2.059 | 0.000 | 2.282 |
| 5 | 0.577 | 2.326 | 0.000 | 2.114 |
| 6 | 0.483 | 2.534 | 0.000 | 2.004 |
| 7 | 0.419 | 2.704 | 0.076 | 1.924 |
5. Basic statistics
| Mean | x̄ = Σx / n |
| Median | Middle value when sorted; average of two middle values if n even |
| Mode | Most frequently occurring value |
| Sample variance | s² = Σ(xᵢ − x̄)² / (n − 1) |
| Sample std dev | s = √s² |
| z-score | z = (x − μ) / σ |
| Standard error | SE = s / √n |
| Range | R = max − min |
6. Hypothesis testing
| Situation | Test | Statistic |
| 1-sample mean, σ known | z-test | z = (x̄ − μ₀)/(σ/√n) |
| 1-sample mean, σ unknown | t-test | t = (x̄ − μ₀)/(s/√n), df = n−1 |
| 2-sample means | 2-sample t | t = (x̄₁−x̄₂)/√(s₁²/n₁ + s₂²/n₂) |
| Proportions or counts | Chi-square | χ² = Σ(O−E)²/E; df = (r−1)(c−1) for independence, k−1 for goodness of fit |
| Two variances | F-test | F = s₁²/s₂² (larger on top) |
Decision rule: reject H₀ if p-value < α (typically α = 0.05). Type I error (α) = rejecting a true H₀. Type II error (β) = failing to reject a false H₀. Power = 1 − β.
Quick decision guide
| Question | Use |
| Did the mean shift? | t-test (paired if before/after same units) |
| Are two counts different than expected? | Chi-square goodness of fit |
| Is there a relationship between two categories? | Chi-square test of independence |
| Did variance change? | F-test or Levene's test |
7. DOE at Green Belt level (2² full factorial)
| Runs | 2² = 4 runs (A−B−, A+B−, A−B+, A+B+) |
| Main effect of A | avg(response when A=+) − avg(response when A=−) |
| Main effect of B | avg(response when B=+) − avg(response when B=−) |
| Interaction AB | avg(response when A and B same sign) − avg(response when A and B opposite sign) |
| Coded regression coefficient | effect / 2 |
A GB project typically uses a 2² or 2³ factorial. Fractional factorials and higher-order designs are BB territory.
8. FMEA
| Risk Priority Number | RPN = Severity × Occurrence × Detection (each 1–10) |
| Severity (S) | Impact of the failure mode on the customer (10 = hazardous) |
| Occurrence (O) | Likelihood the cause leads to the failure (10 = almost certain) |
| Detection (D) | Ability of current controls to find the failure before the customer (10 = no detection) |
| Threshold | Avoid fixed RPN thresholds (AIAG discourages them); address high severity first. AIAG-VDA (2019) replaces RPN with Action Priority (AP). |
| Priority | High Severity + High Detection gap is often more critical than a high RPN from high Occurrence alone. |
9. Lean waste — TIMWOODS
| Letter | Waste | Description |
| T | Transportation | Moving material or people farther than necessary |
| I | Inventory | WIP or finished goods beyond immediate need |
| M | Motion | Unnecessary physical movement by people |
| W | Waiting | Idle time waiting for materials, approvals, or equipment |
| O | Overproduction | Producing more than demand requires (creates other wastes) |
| O | Overprocessing | More work or quality than the customer requires |
| D | Defects | Errors requiring rework or scrap |
| S | Skills | Underutilizing employee knowledge and creativity (8th waste) |
10. VSM symbols — 8 most common
| Symbol name | Shape | Meaning |
| Process box | Rectangle | A manufacturing or service process step where value is added |
| Inventory triangle | Triangle (I) | Inventory or WIP between two process steps |
| Push arrow | Striped arrow → | Material pushed downstream regardless of demand |
| Pull arrow (supermarket) | Curved arrow with supermarket | Material pulled based on downstream signal |
| Supplier/Customer box | Factory icon | External supplier (top left) or customer (top right) |
| Data box | Rectangle below process | Process metrics: C/T, C/O, uptime, shifts, EPE |
| Kaizen burst | Star/lightning burst | Improvement opportunity identified in the current state |
| Timeline | Jagged line at bottom | Value-added time vs. non-value-added time across the stream |
Practice with these formulasTry free CSSGB practice questions and test your Green Belt fundamentals.